Uploaded image for project: 'XJDF / JDF'
  1. XJDF / JDF
  2. JDF-764

Add JobPhase/@ExternalID

    XMLWordPrintable

    Details

    • Type: Story
    • Status: Implemented (View Workflow)
    • Priority: Normal
    • Resolution: Fixed
    • Affects Version/s: None
    • Fix Version/s: 1.7, 2.1
    • Component/s: JMF
    • Labels:
      None
    • Draft:
      Hide

      <Both>
      Table 1.5: Glossary

      Workstep A workstep is an individual JMF XJMFJDF XJDF process that can be processed on a single device
      in one pass. A workstep is comprised of one or multiple <Make unconditional>Phases parts such as setup,
      production or cleanup.

      <XJDF only>
      6.59 NodeInfo
      The NodeInfo resource contains information about planned scheduling. It allows MIS to plan, schedule and invoice jobs or job parts<glos>Worksteps</glos>. If an MIS needs to explicitly specify an individual <glos>Workstep</glos>, it SHOULD be identified in ../Resource/@ExternalID..

      <Both>
      Table 7.69: JobPhase Element

      WorkStepID ? New in <JDF>String/<XJDF>NMTOKEN If present, @WorkStepID SHALL identify the <glosWorkstep</Glos> that is described by this JobPhase. If <xjdf>ResourceSet[@Name="NodeInfo"]/Resource/@ExternalID <jdf>NodeInfo/@WorkStepID is specified, The value SHALL be copied from there. else the value MAY be generated by the device that is generating the JobPhase.
      Show
      <Both> Table 1.5: Glossary Workstep A workstep is an individual JMF XJMF JDF XJDF process that can be processed on a single device in one pass. A workstep is comprised of one or multiple <Make unconditional> Phases parts such as setup, production or cleanup. <XJDF only> 6.59 NodeInfo The NodeInfo resource contains information about planned scheduling. It allows MIS to plan, schedule and invoice jobs or job parts <glos>Worksteps</glos>. If an MIS needs to explicitly specify an individual <glos>Workstep</glos>, it SHOULD be identified in ../Resource/@ExternalID. . <Both> Table 7.69: JobPhase Element WorkStepID ? New in <JDF>String/<XJDF>NMTOKEN If present, @WorkStepID SHALL identify the <glosWorkstep</Glos> that is described by this JobPhase. If <xjdf>ResourceSet [@Name="NodeInfo"] /Resource/@ExternalID <jdf>NodeInfo/@WorkStepID is specified, The value SHALL be copied from there. else the value MAY be generated by the device that is generating the JobPhase.

      Description

      Replacement for the venerable WorkstepID for those that are ignorant of JobPartID

      Resource[NodeInfo]/@ExternalID = Workstep id
      JobPase/@@ExternalID = Workstep id (returned)

        Attachments

          Activity

            People

            • Assignee:
              Unassigned
              Reporter:
              prosi Rainer Prosi
            • Votes:
              0 Vote for this issue
              Watchers:
              2 Start watching this issue

              Dates

              • Created:
                Updated:
                Resolved: