Uploaded image for project: 'XJDF / JDF'
  1. XJDF / JDF
  2. JDF-503

Figure 4-4: Example of a pipe resource linking two processes via push

    XMLWordPrintable

    Details

    • Type: Bug
    • Status: Implemented (View Workflow)
    • Priority: Minor
    • Resolution: Fixed
    • Affects Version/s: None
    • Fix Version/s: 1.7
    • Component/s: JMF
    • Labels:
      None

      Description

      replace first PipeResume with PipePause

        Draft

        PipeResume PipePause = level when P2 sends
        Pause message to P1

         

          Attachments

            Issue Links

              Activity

                People

                • Assignee:
                  Unassigned
                  Reporter:
                  prosi Rainer Prosi
                • Votes:
                  0 Vote for this issue
                  Watchers:
                  3 Start watching this issue

                  Dates

                  • Created:
                    Updated:
                    Resolved: